Lobby Fit-Out

back to projects

Overview

A ground-floor entrance hall fitted out with cabinetry, lighting and a stone floor, scheduled to run while the rest of the building was still being finished. The floor was the first thing laid and the last thing signed off, because everything else in the hall was measured off it.

The Challenges

A hall that other trades were still crossing daily, a stone floor that had to be laid to one level while the building around it was still moving, and lighting that could not be commissioned until the building had power.

The Engineering Solution

The hall protected and handed over floor-first, the stone templated to the finished slab rather than to the drawing, and the lighting set out off the stone joints so the fittings land on the grid the floor already has.

1,900
Square Feet Fitted Out
34
Light Fittings
5 months
On Site
100%
Stone Levels Checked
Tower cranes above a construction site.

Design Elements

  • 01

    Structural Designing

    Customized innovative structural solutions engineered for strength, stability, and resilience, and also focused on safety and lasting durability.

  • 02

    Interior Designing

    Custom millwork, tailored cabinetry, and precision detailing engineered for aesthetic refinement and lasting durability.

  • 03

    Utility Work

    Power, water, drainage and lighting routed and tested in place, coordinated against the structure so nothing has to be cut through after it is finished.

  • 04

    Fabrication Work

    Structural steel, staircases and balustrades shop-drawn and finished off site, then bolted into position once the frame is true.