Lobby Fit-Out
back to projectsOverview
A ground-floor entrance hall fitted out with cabinetry, lighting and a stone floor, scheduled to run while the rest of the building was still being finished. The floor was the first thing laid and the last thing signed off, because everything else in the hall was measured off it.
The Challenges
A hall that other trades were still crossing daily, a stone floor that had to be laid to one level while the building around it was still moving, and lighting that could not be commissioned until the building had power.
The Engineering Solution
The hall protected and handed over floor-first, the stone templated to the finished slab rather than to the drawing, and the lighting set out off the stone joints so the fittings land on the grid the floor already has.

Design Elements
01Structural Designing
Customized innovative structural solutions engineered for strength, stability, and resilience, and also focused on safety and lasting durability.
02Interior Designing
Custom millwork, tailored cabinetry, and precision detailing engineered for aesthetic refinement and lasting durability.
03Utility Work
Power, water, drainage and lighting routed and tested in place, coordinated against the structure so nothing has to be cut through after it is finished.
04Fabrication Work
Structural steel, staircases and balustrades shop-drawn and finished off site, then bolted into position once the frame is true.